How quickly must emergency power transfer occur according to NFPA 110?

The load must transfer from utility to emergency power within 10 seconds of power loss on the life safety and critical branches of power. The equipment branch is not required to transfer within 10 seconds.

Compartir
Suscríbete
Notificar de
guest
0 Comentarios
Comentarios integrados
Ver todos los comentarios